Assembly Exercises in Building Installation Technology
Example training project: The stairway of a multi-storey building shell is to be lit with multiple lamps controlled via a stairway
timing circuit using a timing relay. Fluorescent lights are to be used in place of conventional lights in the basement. Additionally the
basement storey needs two sockets that can be switched on or off from multiple locations.
- Wire stripping exercises
- On/off circuit (installed in conduits)
- Remote control circuit with socket
- Methods for laying wires above the plaster or embedded underneath it, using plain cables or conduits
- Testing and commissioning of circuits to ensure they match the installation and circuit diagram
- Function and use of automatic safety equipment
- Wiring fluorescent lighting circuits in conduits or with plain cables
- On/off and lead-lag circuits with a fluorescent lamp and a socket
- Tandem circuit with a fluorescent lamp and a socket
- Exercise in bending wires and eyelets as well as in wiring
- Multi-circuit, two-way and intermediate circuits with socket
- Stairway lighting circuit with timing relay
Product: Assembly Exercises in Building Installation Technology
Product Code: EWI 1/2